East Greenbush Central School District East Greenbush, NY

View of new turf field from the end zone - June 16, 2008.

Columbia High School logo being installated on the new turf field - June 13, 2008

New turf being installed at Columbia High School - June 2008.

View of turf from bleachers - June 2008.

Clearing has begun for the installation of new turf field.

Removal of existing grass field.

Trenching work at East Greenbush CSD

 
 

Albany Community Charter School
Bethlehem CSD
Brunswick CSD
East Greenbush CSD
Green Tech High Charter School
Massry Center for the Arts
Niskayuna CSD
Saint Francis Hospital ED

 

 

As Construction Manager for this $9million EXCEL project, Sano-Rubin will supervise a variety of work at all District Schools such as replacing older doors, plumbing and lighting fixtures,  resolving HVAC problems at Computer Rooms, adding security at the Main Entrances and classrooms and upgrading the telephone system.  See below for additional work being performed at the individual schools.

Additional information about the District can be viewed at the East Greenbush Central School District's website www.egcsd.org/.

 

Architect: Envision Architects

 

East Greenbush Central School District logo

 

 

 

WORK COMPLETED

  • Replacement of the main dirt athletic field with new turf field.

 

OVERALL PROJECT SCOPE

Bell top Elementary School

  • Replace siding at Library and Computer Room

  • Add classroom heating units to Early Support Room

D.P. Sutherland Elementary School

  • Resolve wet crawl space and rusting wall reinforcing

  • Repair boiler room areaway and rebuild end walls

  • Resolve leak near switchgear & HVAC at Computer Rm.

  • Resolve drainage and pothole problems at Entry Drive

  • Replace portions of original parking lot pavement

  • Repair soffit panels

Citizen Genet Elementary School

  • Resolve masonry issues and make needed repairs

  • Replace 1940s wiring in Cafeteria

  • Refurbish auditorium seating

  • Update ventilation & lighting controls at Auditorium

Red Mill Elementary School

  • Replace sidewalks and repair pavement

  • Rebuild exterior stair at rear exit

  • Replace windows at addition & soffit panels

Green Meadow Elementary School

  • Replace hot water piping

  • Rebuild and reroof loading dock and room at gym

  • Add toilet room exhaust

  • Replace selected windows

Goff Middle School

  • Replace pavement at parking lot &  improve lighting

  • Stabilize masonry walls in cafeteria storage

  • Repair masonry and solve water issues

  • Replace piping, add shutoffs

  • HVAC upgrades at Cafeteria and Gym

Transportation Department

  • Replace pavement, improve drainage

  • Rehabilitate storage building, replace windows & lighting

Columbia High School

  • Replace dirt main event field

  • Resolve cracking at Towers & add filters to transfer fans

  • Improve wet crawlspace

  • Provide sprinkler system water meters

Buildings & Grounds Shop

  • Repair wood framing and bracing

  • Replace roofing, gutters and electric heaters & controls