Latvian Evangelical Church of New York Camp Dining
Hall, Elka Park, NY
The new
camp dining facility operated by the Latvian Evangelical Lutheran Church
is located on Hunter Mountain in the Catskills. The existing dining
hall was demolished to create space for the new wood-frame facility.
The new dining hall is approximately 10,600 sf which includes the large
wrap-around porch and a second floor dormitory area for staff.
The
first floor is comprised of a full service kitchen, training rooms, a
small library and a large open dining area (4,800 sf). The building is
fully sprinklered with water provided from on-site storage tanks. The
facility is only open only during the summer months and was constructed
without a heating system. The project was completed in 8 months and on
time for the opening of Summer Camp 2011.
|
|
 |
|
| |
|
Congregation Ohav Shalom Sanctuary & Social Hall Renovations
Albany, NY
As Construction Manager, Sano-Rubin
supervised the renovation of the Sanctuary and Social Hall. This
work included renovations to the lobby, chapel, conference room, men's
toilet room and complete replacement of the boiler. Two skylights
were added at the lobby and chapel plus a new entrance vestibule was
created. The construction began mid-January 2007 and was
substantially completed by the end of May 2008. Harris A. Sanders,
Architects were the project architect. |
|
 |
|
| |
|
Our Lady of the
Assumption Church Renovations
Latham,
NY
This project consisted of the
total renovation of the main worship space.
This included the alter, choir, reservation chapel and sacristy. These
areas were re-wired for all new lighting
and lighting control package as well as audio systems.
New interior finishes included porcelain tile, VCT, carpet,
acoustic ceiling and wall panels. A new
baptismal font with marble finishes was installed as
well as stained glass windows. The project also
included a new semi-circular entrance
canopy and miscellaneous sitework.
|
|
 |
|
| |
|
Congregation Beth
Emeth Albany, NY
Two year phased renovation and addition project. Phase I
included renovation of existing religious school wing and social spaces
including complete electrical and HVAC upgrade. Phase II consisted
of a 9,000 square foot addition to expand the lobby and add new offices
for staff and clergy. A new chapel was also constructed.
|
|
 |
|
| |
|
First United Methodist
Church Phases 1A, 1B, 1C
Delmar, NY
Masonry restoration including
re-pointing of limestone, brick, and copings, wash down of exterior facade
and new E.I.F.S. on the Chapel. Re-roofed various buildings, which included
asphalt shingles, slate, and modified rubber roofing. Interior renovations
included plaster, ceiling and flooring repairs.
Phase 1A Renovation included
rehabilitation of the Sanctuary, including replacement of
all finishes. A new air conditioning system, fire
alarm system and electric service was installed.
Reconfigured drop-off area, replaced existing
concrete sidewalks and steps and rehabilitated existing granite entry and
metal railings.
Phases 1B & 1C included
rehabilitation of the Chapel, Lounge, Church Offices, and Lower Level
Corridors. Work included asbestos tile abatement,
new interior and exterior doors and windows, special wall coatings, new
porcelain tile floors, carpet, VCT, new ceilings, lighting and new HVAC and
fire alarm systems. Reconfigured three bathrooms
for handicapped accessibility. Structural
modification of corridors was required for
accessible ramps and foundation repair.
|
|
 |
|
|