Recent Projects
|
|

|
|
|
|
See our
LEED®
page
for more projects.
 |
Siena College Serra Hall Kitchen Renovation & St. Thomas
More House Renovation
Sano-Rubin
was selected as the Design-Builder for the kitchen renovation project at
Serra Hall. The project includes the removal, replacement and re-use of the
existing food preparation equipment and fixtures and reconfiguration of
kitchen space to improve space utility and process flow. The renovation
also includes kitchen staff support spaces such as locker room, restrooms
and offices.
Sano-Rubin
worked closely with the College to provide options for the best use of space
and equipment for their budget. Once on campus, Sano-Rubin was awarded the
storm & sanitary line project which ties into the kitchen renovation and the
St. Thomas More House Alteration project.
|
|
|
|
|
|
State
University of New York at Albany Campus Center Entrance Hall Renovation
Sano-Rubin was the general contractor for
the renovation of the University’s Campus Center Entrance Hall project.
The work encompassed renovation of the existing entrance hall and
reconfiguration of two adjacent spaces into additional lobby space. The
existing precast columns and walls were removed to create a more open
floor plan for lounge spaces and information desk. All interior
finishes and signage were upgraded to University standards.
This
work included:
·
Repair of
the original terrazzo floors
·
Upgrade of
the lighting throughout all spaces
·
Refurnishing the original 1960’s historical light fixtures
·
Addition
of acoustical fabric panels
·
Installation of new wood panels at the main entrance lobby
·
Replacement of windows and doors
·
Installation of specialized concealed accordion fire doors
|
|

 |
|
|
|
|
Vista House
for Women & Children
Vista
House is a transitional residence with 22 beds to provide shelter and
care for 6 single women and 5 mothers with up to 11 children.
NYS
OASAS Funding
With help from counseling, education, and employment training programs,
women will live in a healthy environment and maintain an alcohol and
drug-free lifestyle. Life-skills training will be emphasized so that
residents have the ability and confidence to secure employment and
continue on the path of recovery within the community.
|
|
 |
|
|
|
|
Brighter
Choice Charter Middle School for Boys and Girls
Sano-Rubin
Construction Co., Inc. was the General Contracting prime contractor for
the recently completed new 3-story, 54,000 sf middle school for both
boys and girls. The boys are girls each have separate mirrored wings
containing a reception area, classrooms, computer rooms, lab/project
rooms, lecture rooms and staff offices. The center common space
separates the 2 wings and includes the gymnasium, cafeteria, music room
and library. Unique features include a second floor semi-circular
outdoor classroom and glass floor on the third floor. The third floor
will also be home to the Brighter Choice Foundation offices. The city
site is fully landscaped to provide green spaces and is enhanced by a
pergola, stamped concrete patio and sundial |
|
 |
|
|
|
|
Guilderland
Central School District
|
|
 |
|
|
|
|
Niskayuna
Central School District
The $94.5 million
district-wide
project consisted
of additions, renovations, alterations to all 5 elementary schools, two middle
schools
and the high school. District-wide upgrades were also performed
in conjunction with the construction and included telephone system
replacement, security, swipe card access system and classroom computer
technology. Extensive work took place at the high school which
consisted of 8 additional classrooms, expansion of the Media Center and
Music Rooms, creation of a study common, athletic field work and
installation of geothermal wells.
|
|
 |
|
|
|
|
The Fort Orange Club
Athletic Addition
As Construction Manager, Sano-Rubin
managed the construction of the new 6,770 sf Athletic Wing. The
addition includes a new foyer, Group Fitness Studio, Massage Area,
Lobby/Lounge, 2 International Squash Courts, Viewing Mezzanine, Elevator
and Stair. The work also included renovation of 5,720sf of the original
wing. The renovation converted the existing squash courts into a 1,800
sf, 2 -story Fitness Center and upgraded the lobby space and swimming
pool.
Additional improvements
were made to the Tap Room for improved
interior traffic flow. The existing building infrastructure was
upgraded by replacing and upgrading the HVAC equipment in the mechanical
room, replacing thru-wall units in guest rooms, improving plumbing
drainage, replacing outdated electrical panels and feeders, upgrading
and expanding the main electrical service. A new exterior entrance
terrace and relocation of the fire escape outside the Tap Room
were also completed in the Spring/Summer 2010.
|
|
 |
|
|
|
|
First Niagara Branch Bank
Sano-Rubin was the general contractor for the new branch bank office for
First Niagara Bank located on Route 50 in Wilton, NY. The new branch
consists of teller stations with adjacent work area, four customer
service representative areas, manager’s office, conference room, seating
area, safe, drive thru and staff support areas.
back to top |
|
 |
|
|
|
|
Dental Arts Building for Dr. Vignali
Albany, NY
Sano-Rubin was the general contractor for the new 3,500sf dental arts
building located on Colvin Avenue in Albany. The building houses 7
treatment room reception, waiting area, sterilization and equipment room
and staff support area.