|
Albany
City School District Hackett Middle School-Phase II
Albany, NY
Sano-Rubin was the general
contractor for the Albany City School
District’s renovation of the Hackett Middle School Phase II, which began
June 2006. The building was vacated during the
renovation. For the 2006-2007 and
2007-2008 school years, students attended classes at
the former Philip Schuyler Elementary School.
Phase II
included extensive renovations to all five floors to accommodate up to
650 students in grades 6-8 and divide those students into teams of
100-115 students each. Academic wings were organized around core classes
such as English, social studies, and math. Classrooms for technology,
art, and music are shared among the teams.
The building was designed so that sixth, seventh, and eighth
graders are separated by floor or wing. In addition, each wing includes
administrative offices for student oversight and assistance. Boys and
girls restrooms were also added to each floor. Each wing has six
classrooms, four for general instruction, one for special education, and
one for science.
The
renovations included:
.
28 general instruction classrooms
.
6 Special Education classrooms
.
6 science rooms with prep space
.
1 family and consumer science room,
1 technology classroom
.
1 choral room with practice area,
1 band room with practice area
.
2 art rooms with kiln and storage,
2
new stair towers & new elevator
.
Renovated library/media center on the ground floor
.
Gymnasium,
Swimming
pool and renovated locker rooms
.
Renovated auditorium (preserved
historic features, renovated seating)
.
New cafeteria and kitchen on lowest level
.
Expanded and renovated administrative support areas
and nurse's suite
.
Faculty work areas
Infrastructural improvements:
.
Upgraded heating, ventilation, &
electrical systems with neww lighting
throughout
.
Improved fire protection and security
and new PA system
.
Computers and laptop stations with Internet access in
every classroom
.
Air conditioning throughout the building
.
Full handicapped accessibility, new
sidewalks & landscaping
.
New suspended acoustical ceilings and
renovated corridors
.
Replacement or restoration of exterior masonry, roofing,
doors, and windows
|