| |
Showcase
Hospitals |
|
|
| |
Colleges & Universities Commercial Community Day Care Education K-12 Health Centers Hospitals Hospitality Housing Industrial-Municipal Nursing Homes Religious Retail Specialty Buildings |
Northeast
Health/Albany Memorial Hospital MRI Addition Albany, NY
This new 1,500
square foot addition to Albany Memorial Hospital
contains an MRI room, equipment, control room and two changing rooms.
Renovations were also made to the Radiology waiting room and Blood
Infusion room as well as re-routing the Physician’s parking entrance.
Work was completed on time and on budget despite severe winter
conditions.
|
|
 |
|
| |
|
Ellis Hospital Cardiac Catheterization Lab
Schenectady, NY
Sano-Rubin was the Construction Manager for
this 5,000 square foot renovation project. Both of the Hospital's
cardiac labs were renovated as well as the core suite area. The
suite consists of an 8-bed patient holding area, office space and
nurses' station. A temporary cardiac cath lab was created while
the renovations were taking place. The work was completed over 9
months with no disruption to Hospital services.
|
|
 |
|
| |
|
Northeast Health / Samaritan Hospital MRI Addition
Troy,
NY
New MRI suite addition
adjacent to Hospital's south wing located on Peoples Avenue in Troy.
Addition consisted of new control room, equipment room, waiting area,
changing area and procedure room. Concurrently renovated existing
cardio pulmonary wing and replaced mechanical infrastructure for the south
wing.
|
|
 |
|
| |
|
«2003 Build New York Award Winner
Additional
emergency room space of 13,000sf and interior renovations of the existing
emergency department totaling 17,000sf to be completed in September of 2002.
During the construction of Phase 1 an additional floor was added
consisting of 8,500sf of space at the first floor level.
|
|
 |
|
| |
|
15,000 square foot addition with 15,000 square feet of renovation to create new
ambulatory surgery department and new main entry and lobby. Includes tie-in renovations
and relocations for OR Suite, Cardiology, Telemetry, Dialysis and inpatient rooms. Subsequently completed $2.1 million
renovation over several months. The largest of these was a new
cardiac catheterization laboratory and recovery area addition which was
constructed entirely below grade.
|
|
 |
|
| |
|
Complete gut demolition and reconstruction of over
70,000 square feet of patient care rooms.
Also included new main entrance and canopy and new courtyard.
|
|
 |
|
| |
|
50,000 square foot addition for Obstetrics, LDRs, ICCU, Pediatrics and Dietary
with additional building entry and loading dock area. Includes tie-in renovations to
Outpatient Clinic area and Admitting.
|
|
 |
|
| |
|
5,200 s.f. of renovations to create new angiography suite. Provided a new HVAC system
for the medical imaging department and new finishes throughout the nuclear medicine suite.
All without disrupting the departments operation.
|
|
 |
|