Masonry restoration including
re-pointing of limestone, brick, and copings, wash down of exterior facade
and new E.I.F.S. on the Chapel. Re-roofed various buildings, which included
asphalt shingles, slate, and modified rubber roofing. Interior renovations
included plaster, ceiling and flooring repairs.
Phase 1A Renovation included
rehabilitation of the Sanctuary, including replacement of
all finishes. A new air conditioning system, fire
alarm system and electric service was installed.
Reconfigured drop-off area, replaced existing
concrete sidewalks and steps and rehabilitated existing granite entry and
metal railings.
Phases 1B & 1C included
rehabilitation of the Chapel, Lounge, Church Offices, and Lower Level
Corridors. Work included asbestos tile abatement,
new interior and exterior doors and windows, special wall coatings, new
porcelain tile floors, carpet, VCT, new ceilings, lighting and new HVAC and
fire alarm systems. Reconfigured three bathrooms
for handicapped accessibility. Structural
modification of corridors was required for
accessible ramps and foundation repair.