| |
Showcase
Religious |
|
|
| |
Colleges & Universities Commercial Community Day Care Education K-12 Health Centers Hospitals Hospitality Housing Industrial-Municipal Nursing Homes Religious Retail Specialty Buildings |
Our Lady of the
Assumption Church Renovations
Latham,
NY
This project consisted of the
total renovation of the main worship space.
This included the alter, choir, reservation chapel and sacristy. These
areas were re-wired for all new lighting
and lighting control package as well as audio systems.
New interior finishes included porcelain tile, VCT, carpet,
acoustic ceiling and wall panels. A new
baptismal font with marble finishes was installed as
well as stained glass windows. The project also
included a new semi-circular entrance
canopy and miscellaneous sitework.
|
|
 |
|
| |
|
Congregation Beth
Emeth Albany, NY
Two year phased renovation and addition project. Phase I
included renovation of existing religious school wing and social spaces
including complete electrical and HVAC upgrade. Phase II consisted
of a 9,000 square foot addition to expand the lobby and add new offices
for staff and clergy. A new chapel was also constructed.
|
|
 |
|
| |
|
First United Methodist
Church Phases 1A, 1B, 1C
Delmar, NY
Masonry restoration including
re-pointing of limestone, brick, and copings, wash down of exterior facade
and new E.I.F.S. on the Chapel. Re-roofed various buildings, which included
asphalt shingles, slate, and modified rubber roofing. Interior renovations
included plaster, ceiling and flooring repairs.
Phase 1A Renovation included
rehabilitation of the Sanctuary, including replacement of
all finishes. A new air conditioning system, fire
alarm system and electric service was installed.
Reconfigured drop-off area, replaced existing
concrete sidewalks and steps and rehabilitated existing granite entry and
metal railings.
Phases 1B & 1C included
rehabilitation of the Chapel, Lounge, Church Offices, and Lower Level
Corridors. Work included asbestos tile abatement,
new interior and exterior doors and windows, special wall coatings, new
porcelain tile floors, carpet, VCT, new ceilings, lighting and new HVAC and
fire alarm systems. Reconfigured three bathrooms
for handicapped accessibility. Structural
modification of corridors was required for
accessible ramps and foundation repair.
|
|
 |
|
| |
|
New 5,300 s.f. worship space and 400 s.f. additions to kitchen and storage spaces.
Worship space constructed utilized 68 foot wide laminated wood arches with laminated wood
roof decking. Renovations to the existing facility includes the prior Worship space of
2,400 square feet.
|
|
 |
|
| |
|
New temple on New Scotland Avenue site with sanctuary, religious
school classroom space, kosher kitchen and dining hall. Considerable architectural
woodwork throughout.
|
|
 |
|
|