Sano-Rubin logo

 

 

 

 

 

 

 

 

 

 

97 Years of Construction Experience

 

624 Delaware Avenue . PO Box 9078 . Albany, NY  12209   T: 518 . 462 . 6471  F: 518 . 462 . 6866  . mail@sano-rubin.com


 

 

Home | About | History | Awards | Community | What's Bidding? | Recent Projects | Job Sites | Showcase | Careers

 

 

Showcase Religious

   
  Colleges & Universities
Commercial
Community
Day Care
Education K-12
Health Centers
Hospitals
Hospitality
Housing
Industrial-Municipal
Nursing Homes
Religious
Retail
Specialty Buildings

Our Lady of the Assumption Church Renovations Latham, NY

 

This project consisted of the total renovation of the main worship space.  This included the alter, choir, reservation chapel and sacristy. These areas were re-wired for all new lighting and lighting control package as well as audio systems.  New interior finishes included porcelain tile, VCT, carpet, acoustic ceiling and wall panels.  A new baptismal font with marble finishes was installed as well as stained glass windowsThe project also included a  new semi-circular entrance canopy and miscellaneous sitework.

 

  New entrance canopy at Our Lady of the Assumption Church, Latham, NY.  
   
Congregation Beth Emeth Albany, NY

Two year phased renovation and addition project.  Phase I included renovation of existing religious school wing and social spaces including complete electrical and HVAC upgrade.  Phase II consisted of a 9,000 square foot addition to expand the lobby and add new offices for staff and clergy.  A new chapel was also constructed.

 

 

   
   

First United Methodist Church Phases 1A, 1B, 1C Delmar, NY

Masonry restoration including re-pointing of limestone, brick, and copings, wash down of exterior facade and new E.I.F.S. on the Chapel.  Re-roofed various buildings, which included asphalt shingles, slate, and modified rubber roofing.  Interior renovations included plaster, ceiling and flooring repairs. 

Phase 1A Renovation included rehabilitation of the Sanctuary, including replacement of all finishes.  A new air conditioning system, fire alarm system and electric service was installed. Reconfigured drop-off area, replaced existing concrete sidewalks and steps and rehabilitated existing granite entry and metal railings.

Phases 1B & 1C included rehabilitation of the Chapel, Lounge, Church Offices, and Lower Level Corridors.  Work included asbestos tile abatement, new interior and exterior doors and windows, special wall coatings, new porcelain tile floors, carpet, VCT, new ceilings, lighting and new HVAC and fire alarm systems. Reconfigured three bathrooms for handicapped accessibility.  Structural modification of corridors was required for accessible ramps and foundation repair.

 

   
   
Shenendehowa United Methodist Church Clifton Park, NY

New 5,300 s.f. worship space and 400 s.f. additions to kitchen and storage spaces. Worship space constructed utilized 68 foot wide laminated wood arches with laminated wood roof decking. Renovations to the existing facility includes the prior Worship space of 2,400 square feet.

 

  Exterior of Shenendehowa United Methodist Church  
   
Temple Israel Albany, NY

New temple on New Scotland Avenue site with sanctuary, religious school classroom space, kosher kitchen and dining hall. Considerable architectural woodwork throughout.

 

  Temple Israel, Albany, NY