East Greenbush Central School District East Greenbush, NY


 


Notices & Shutdowns - Caution Banner

NOTICES & SHUTDOWNS

 
 

Albany Public Library Branches
Bethlehem CSD
East Greenbush CSD
Guilderland CSD
Niskayuna CSD
Saint Francis Hospital ED
Hope House

East Greenbush Central School District logo

 

 

 

As Construction Manager for this $9 million EXCEL project, Sano-Rubin is overseeing a variety of work at all District Schools.  Work includes replacing older doors, plumbing and lighting fixtures,  resolving HVAC problems at Computer Rooms, adding security at the Main Entrances and classrooms and upgrading the telephone system.  See below for additional work being performed at the individual schools.

Additional information about the District can be viewed at the East Greenbush Central School District's website www.egcsd.org/.

 

Architect: Envision Architects

 

CURRENTLY UNDER CONSTRUCTION Updated: September 1, 2009

The second phase of construction work has commenced with the restoration of masonry at Citizen Genet Elementary School.  This summer, reconstruction work will also be performed at the other District buildings.

OVERALL PROJECT SCOPE

Bell top Elementary School

Replace siding at Library and Computer Room

Add classroom heating units to Early Support Room

D.P. Sutherland Elementary School

Resolve wet crawl space and rusting wall reinforcing

Repair boiler room areaway and rebuild end walls

Resolve leak near switchgear & HVAC at Computer Rm.

Resolve drainage and pothole problems at Entry Drive

Replace portions of original parking lot pavement

Repair soffit panels

Citizen Genet Elementary School

Resolve masonry issues and make needed repairs

Replace 1940s wiring in Cafeteria

Refurbish auditorium seating

Update ventilation & lighting controls at Auditorium

Red Mill Elementary School

Replace sidewalks and repair pavement

Rebuild exterior stair at rear exit

Replace windows at addition & soffit panels

Green Meadow Elementary School

Replace hot water piping

Rebuild and reroof loading dock and room at gym

Add toilet room exhaust

Replace selected windows

Goff Middle School

Replace pavement at parking lot &  improve lighting

Stabilize masonry walls in cafeteria storage

Repair masonry and solve water issues

Replace piping, add shutoffs

HVAC upgrades at Cafeteria and Gym

Transportation Department

Replace pavement, improve drainage

Rehabilitate storage building, replace windows & lighting

Columbia High School

Replace dirt main event field

Resolve cracking at Towers & add filters to transfer fans

Improve wet crawlspace

Provide sprinkler system water meters

Buildings & Grounds Shop

Repair wood framing and bracing

Replace roofing, gutters and electric heaters & controls

 

 

 

 

 

 

 

Genet Elementary School

MAIN ENTRANCE CLOSED

DURING CONSTRUCTION

Use Southwest doors to Access Elementary School.

Use East doors for Student Bus Loading Zone.

For additional information go to
www.egcsd.org/genet/index.htm

 

Masonry repairs continue at Genet Elementary School.

Masonry repairs at Genet's main entrance.

New sidewalks at Red Mill Elementary.

Window replacement took place at both Green Meadow and Red Mill Elementary Schools.

Floors are shined and ready for the start of school at Belltop Elementary.

New siding was installed at Belltop Elementary.

View of new turf field from the end zone - June 16, 2008.

Columbia High School logo being installated on the new turf field - June 13, 2008